The DIMIA Head Office is one of the largest Federal Government projects in recent years, consolidating 1,800 staff within one location. HBO+EMTB is responsible for initial facilities planning, design and documentation of both base building and integrated fitout. The 34,100m2 development incorporates two separate wings each six levels, connected by a central link. The design adheres to the DIMIA's stringent security requirements and exceeds the performance requirements of the Commonwealth's energy policy. A highly collaborative approach between builder, developer, tenant and design team has seen this complex project delivered two months ahead of schedule and at commercially attractive terms. The design breaks with the Canberra tradition of heavy masonry facades and reinterprets the building structure with a grided white skin cladding and open gazed infill panels. Marine grade aluminium sheeting runs the length of the link, with square windows contrasting with the rectangular glazing on the wings. The building floats on exposed columns of a colonnade that encircles the ground level, containing functions accessible to both staff and public. Practical completion certification was issued in November 2004 some two months ahead of contract obligations. The building has set new standards for A grade accommodation in terms of finishes, space, efficiency, individual workpoint solution and energy usage.
The head office of DIMA was built over stages: At stage one, the north wing was built, with 800 staff moved into the new offices. Stage two involved demolishing pre-existing buildings, with the third stage seeing the building of the linking element and south wing, and the remaining staff members being instated.
Gathering together a vast number of staff from separate addresses into one, very large head office requires careful consideration. Not only are the build logistics a challenge on such an upscale project but there is the human factor to consider â€" how to give the space a sense of humanity.
These considerations and environmental sustainability were three key factors addressed when HBO+EMTB created the DIMA head offices in Canberra, owned by Challenger Financial Services. HBO+EMTB was responsible for the planning and design of the base building and integrated fit-out.
The director of HBO+EMTB's Canberra office, Kirsten Rodgers, outlines aspects of the project.
"DIMA's head office is one of the largest government projects undertaken in recent years, consolidating 1,800 staff into one location," she says. "The building's 34,100m2 of floor space incorporates two separate wings, each six levels plus basement parking, connected by a central link."
The floor plates break down as 2,080m2 of floor space on the northern wing and 2250m2 of floor area on the southern building.
To address the need for a human scale when faced with such large floor plates, HBO+EMTB created functional environments consisting of a ‘town square', or central atrium, with ‘neighbourhoods' for the various departments located in each wing. The building was naturally designed from the inside out to address this concept.
There are even colour-coded ‘streets' running across the upper five levels of the head office's linking element. They provide speedy orientation in the vast building and also bring a feeling of localisation, even intimacy to the disparate areas.
The double height atrium, or town square, features a front wall of glazing, giving it a strong visual connection with the exterior piazza in front of it. The overall effect is a welcoming one, making light of the overall scale.
The entire building sits on columns, linked by glass, giving the structure a sense of floating and again softening its build forms. This all means that the building encourages approachability â€" a café on the ground floor of the north wing, for example, is open to the public as well as staff to wander into.
Elsewhere in the atrium and throughout the head office, there are other shared facilities such as meeting, conferencing and breakout spaces.
The building is as forward-looking in its environmental emphasis as it is in the accommodationof its staff. To this end, government reports have cited it as a flagship for Energy Sustainable Development. Several individual architectural approaches were taken.
"Building on a south-to-north orientation reduced exposure to the sun's rays," says Rodgers. "The facades, broken down into window grids, use high-efficiency, solar-treated lowE glazing."
Other elements addressed include energy efficient lighting equipment, representing huge savings when specified on this scale, and environmentally in-tune plant and air handling equipment.
With site constraints ranging from existing tenanted buildings through to heritage listed trees, the upscale construction was undertaken in three stages, with the architectural firm and constructors, Bovis Land Lease, working in close collaboration.
As well as overcoming logistical problems, the staggered stages of construction allowed the influx of staff to happen in stages, helping them to come to grips with the head office's scale bit by bit. This included many staff visiting the site before it was completed and before their own relocation there.
"Even considering the building's size and capacity, the individuals at its heart were always our prime consideration," says Rodgers.
The desk layouts were chosen for optimum versatility. Part of the humanising approach was to let people have a hand in arranging their individual workspaces.